Methodology
The Decision Framework
The five-component methodology for identifying, sequencing and sustaining decisions on criteria the client defines herself.
Reference
Definitions for the Decision Framework, its components and offers.
This section defines the terms used in Sofía Silva Berenguer’s work: the Decision Framework, its five components, the two offers that apply it, and six ordinary words or phrases that carry a specific meaning here. Each defined term has its own page, set out in nine numbered parts: term, definition, purpose, scope, components, outputs, relationships, authorship and version control.
It is written as a reference, in the third person. The rest of this site speaks in Sofía’s own voice.
The methodology and its five components, in the order they are applied.
Methodology
The five-component methodology for identifying, sequencing and sustaining decisions on criteria the client defines herself.
Component 1 of 5
Naming what a decision includes, what it excludes and who owns it.
Component 2 of 5
Ordering initiatives by energy and life, not a project plan.
Component 3 of 5
Deciding what to keep, park or let go, as deliberate design rather than failure.
Component 4 of 5
The review rhythms that hold a decision in place over time.
Component 5 of 5
The integrated system the first four components build, owned by the client.
The two offers through which the framework is applied.
One-to-one
Two one-to-one sessions, fourteen days apart, that produce one real decision on criteria the client defines herself.
Small group · waitlist
A small online group, two sessions fourteen days apart, in which each woman builds her own criteria and sorts her own list.
Common words given a specific meaning in this work. Each has a short entry here rather than a page of its own.
The relationships named on each term page. The same names are used in each page’s structured data, under the prefix sofia:, which resolves to this section.
| Relationship | Meaning |
|---|---|
| Part of | The term is one component of the target. |
| Components | The target is one component of the term. |
| Produces | Applying the term yields the target as an output. |
| Produced by | The term is an output of the target. |
| Constrains | The term limits or conditions how the target can be applied. |
| Constrained by | The target limits or conditions how the term can be applied. |
| Resolves into | Applying the term ends in the target as its settled outcome. |
| Formed from | The term is the settled outcome of the targets acting together. |
| Operationalises | The term puts the target into practice in a specific format. |
| Operationalised by | The target puts the term into practice in a specific format. |
| Applies | The term uses the target in a specific setting. |
| Applied in | The target uses the term in a specific setting. |
| Requires | The target is a precondition for the term. |
| Precondition for | The term is a precondition for the target. |
| Enrolment status | Whether an offer can be booked now; "waitlist" means it cannot. |
Version 1, 7 October 2026. Each term page states its own version and last review date.
How the framework works in practice: The Approach.